Hosting Service

 
1. We offer the Miner Hosting Service, and the website below is the contract for this hosting service.
     MinerHostContract:
     https://drive.google.com/open?id=1h5ZJegdUSL5uo_oRDq_6UD-zl_zth9u1

 2. We also offer the overclock the miners service for T17, S17, S17pro and S17+.
    The overclock firmware can rise the miner hashrate up to 20%-40%.
   Here below are the overclock user manual and the overclock firmware.

(1) S17 pro overclock firmware:
     https://drive.google.com/open?id=1af0Acz9UJk9G_Z2VwQpjowZsGWIyYn4A
(2) S17 overclock firmware:             
     https://drive.google.com/open?id=1xbrxqCfRLCGkK99Rf78iK1CmVCVD81Hp  
(3) T17 overclock firmware:          
     https://drive.google.com/open?id=1WZZQWSh5xPP6olPoBE2odsmG5oVUW0RL
(4) SD_X17 SD flash firmware:       
     https://drive.google.com/open?id=1Uq3txU4VZSfPpW6kvN7KUUCcT-pNu16o
(5)UserManual:          
     https://drive.google.com/open?id=1NztSEfNlqdMc5Eg8_qieQT_xeiX0ph07

 

Cooldragon Miners Hosting Service Farms Overview

Hydro Power Farms:

1.Stable and safe state-owned power supply;

2.Electricity price includes applicable taxes.

3.Power failure will not exceed 48 hours per month;

4.Maintenance team is stationed to guarantee uptime of 99% or higher;

5.All fiber node network. China Unicom, China Mobile and China Telecom are providing high-

  quality network connection;

6.Professional farm design to meet the needs of large hashrate miners;

7.Professional tech support team works at the farm with 5 years works experience.

8.Farm already in operation, machines can be setup immediately;

9.Power consumption calculated accurately.

 

Location

Yunnan/

Sichuan

Price

(Wet Season):

0.045usd

per kwh.

Electricity

Type

Hydro Power

   

Electricity

Loss

3%

Minimum

Quantity

40pcs

Supported Hardware

Asic miner

(big hashrate)

Remaining

Capacity

50000pcs

Operational

Start Date

2017

Other Costs

None

 

 

 

 

 

Attention:  This is wet season price, time is from May to Nov.

 

 

Coal Power Farms

1.Stable and safe state-owned power supply;

2.Electricity price includes applicable taxes.

3.Power failure will not exceed 48 hours per month;

4.Maintenance team is stationed to guarantee uptime of 99% or higher;

5.All fiber node network.

6.Professional farm design to meet the needs of large hashrate miners;

7.Professional tech support team works at the farm with 4 years works experience.

8.Farm already in operation, machines can be setup immediately;

9.Power consumption calculated accurately.

 

Location

Xinjiang/

Neimenggu

Price

(full year)

0.055usd

per kwh

Electricity

Type

Coal Power

Operational Start

Date

2018

Electricity

Loss

3%

Minimum

Quantity

40pcs

Supported

Hardware

Asic miner(big hashrate)

Remaining

Capacity

10000pcs

Other

Costs

None

   

 

 

 

 

 

 

 

 

 

 

 BRIEF INTRODUCTION ABOUT THE MINER HOSTING SERVICE

 

 

There are no products to list in this category.